Richmond, VA • Greater Richmond Independent Living Specialists
804-409-0928
Greater Richmond regional map graphic showing six jurisdictions with house icons
Greater Richmond ADU Rules by Jurisdiction

Richmond vs Henrico vs Chesterfield vs Hanover vs Goochland vs Powhatan ADU Rules

Are ADU rules the same across Greater Richmond? No. The City of Richmond has its own zoning ordinance, and each surrounding county—Henrico, Chesterfield, Hanover, Goochland, and Powhatan—has its own ordinance and approval procedures. A property only a few miles away can face a different approval type, size standard, occupancy rule, parking requirement, utility rule, setback framework, and rental rule.

This page compares the current ADU frameworks across these six jurisdictions. Exact rules are verified from each jurisdiction's current official source, and where a rule cannot be confirmed confidently, the page says so rather than guessing.

CALL 804-409-0928
City of Richmond • Henrico • Chesterfield • Hanover • Goochland • Powhatan
Why the Rules Differ

Richmond Area Is Not One Zoning Authority

Greater Richmond is not a single zoning authority. The City of Richmond has its own zoning ordinance, and each county has its own zoning ordinance and approval procedures. ADU rules are set locally, not regionally, so the same ADU concept can follow a very different path across county lines.

That means a property a few miles away may face a different approval type, size standard, occupancy rule, parking requirement, utility rule, setback framework, rental rule, or family-use limitation. The property address—not a generic Richmond-area assumption—is what determines which rules apply.

01

City of Richmond

Has its own ADU ordinance. Current City guidance permits one ADU in residential zoning districts subject to the City's ADU ordinance.

02

Henrico County

Has its own rules. Current County guidance limits ADUs to qualifying single-family-detached properties and requires a Conditional Use Permit.

03

Chesterfield County

Current County cases show attached and detached ADUs continuing to require conditional-use approval under the current zoning framework.

04

Hanover County

Current homeowner guidance states many residential districts require a Special Exception Permit for a qualifying family-member apartment.

05

Goochland County

Current County activity shows detached accessory family housing units requiring a Conditional Use Permit under applicable zoning provisions.

06

Powhatan County

Current County guidance recognizes detached accessory dwellings and attached accessory apartments in certain zoning districts.

Current ADU Framework by Jurisdiction

A Clean Comparison of Current Greater Richmond ADU Frameworks

The comparison below summarizes the current ADU framework for each jurisdiction based on current official guidance. Only verified, current information is included. Where a rule cannot be confirmed confidently, the page says so. No Richmond City rule is copied into a county, and no county rule is treated as universal.

City of Richmond

Framework: One ADU permitted in residential zoning districts subject to the City's ADU ordinance. Approval: Administered under the City ordinance. Size approach: No more than one-third of the main dwelling floor area or 500 sq ft, whichever is greater. Underlying zoning still controls setbacks, lot coverage, and height. Verify against current official City rules for the specific property.

Henrico County

Framework: ADUs limited to qualifying single-family-detached properties. Approval: Conditional Use Permit required. Size approach: Lesser of 800 sq ft or 35% of the principal dwelling's finished floor area. Notes: County rules include additional utility, access, parking, and rental standards. Verify current County rules for the specific property.

Chesterfield County

Framework: Attached and detached ADUs continue to require conditional-use approval under the current zoning framework. Approval: Conditional-use approval. Size approach: Follows current Chapter 19.2 rules—property-specific review required; confirm exact dimensional standards with current County Planning information before publishing numbers.

Hanover County

Framework: In many residential districts, an apartment for qualifying family members requires a Special Exception Permit and must be attached to the main house or to another building such as a garage. Approval: Special Exception Permit. Notes: Hanover has made recent changes to accessory-housing terminology—verify the current ordinance for the specific property.

Goochland County

Framework: Detached accessory family housing units require a Conditional Use Permit under applicable zoning provisions; attached family housing has separate County standards and historically includes family-occupancy restrictions. Approval: Conditional Use Permit for detached. Property-specific review required—confirm current ordinance eligibility.

Powhatan County

Framework: Recognizes detached accessory dwellings and attached accessory apartments in certain zoning districts. Size approach: Permitted districts and maximum proportional floor area vary by zoning district. Notes: Building permitting and, where applicable, well and septic requirements also apply. Verify the current handout and ordinance for the specific property and district.

Greater Richmond regional map graphic showing six jurisdictions with house icons
Why Property Address Comes First

The Same ADU Concept Can Follow a Different Path Across County Lines

Because each jurisdiction sets its own ADU rules, the property address—not a Richmond-area assumption—determines what applies. The process below shows how the jurisdiction is confirmed and the ADU is planned around that jurisdiction's current rules.

01

Confirm Actual Jurisdiction

Confirm the actual jurisdiction for the property—City of Richmond, Henrico, Chesterfield, Hanover, Goochland, or Powhatan. The address, not the neighborhood name, determines which rules apply.

02

Confirm Parcel Zoning

Confirm the parcel's zoning district within that jurisdiction, because ADU rules often vary by district as well as by locality.

03

Identify ADU Type

Identify the ADU type—detached, attached, garage apartment, garage conversion, basement, or in-law suite—since each can trigger different rules.

04

Review Current Local Rules

Review the current local ADU rules for that jurisdiction and district, verified from the official source. Do not apply another jurisdiction's rules by assumption.

05

Review Property Dimensions + Utilities / Septic

Review the property dimensions, utilities, and septic where applicable. These work with the local rules to determine what is practical.

06

Review Existing Structures

Review existing garages, outbuildings, and accessory structures that may be involved in the ADU project.

07

Determine Approval Path

Determine the approval path for that jurisdiction—ordinance administration, conditional-use, special exception, or district-specific permitting—and plan around it.

08

Develop Design Around That Jurisdiction

Develop the ADU design around that jurisdiction's current rules, not a generic Richmond-area template. The design follows the property and the jurisdiction.

Each Greater Richmond jurisdiction has its own ADU ordinance and approval process. The comparison above is based on current official guidance and is verified for the specific property before any project is planned. No Richmond City rule is applied to a county, and no county rule is treated as universal. Where a rule cannot be confirmed confidently, property-specific review with the current County regulations is required. Virginia's enacted ADU statute (effective July 1, 2027) does not make all local rules identical—see our Virginia ADU Law 2027 page.
Greater Richmond ADU Rule Questions

Frequently Asked Questions About Greater Richmond ADU Rules

Direct answers by jurisdiction—each verified from current official guidance.

AEO • GEO • Zoning • Feasibility

No. The City of Richmond has its own ADU ordinance, with a size formula tied to the main dwelling—generally one-third of the main dwelling floor area or 500 square feet, whichever is greater. Henrico County has its own rules: ADUs are limited to qualifying single-family-detached properties and require a Conditional Use Permit, with a maximum of the lesser of 800 square feet or 35% of the principal dwelling's finished floor area, plus its own utility, access, parking, and rental standards. The two are not interchangeable.
Greater Richmond regional map graphic showing six jurisdictions with house icons
Start With the Property's Actual Jurisdiction

Check Your Property's ADU Jurisdiction

Greater Richmond is not one zoning authority. The City of Richmond, Henrico, Chesterfield, Hanover, Goochland, and Powhatan each set their own ADU rules, and the same ADU concept can follow a very different path across county lines.

Share your property address and your ADU goals, and we can confirm the jurisdiction and review the rules that actually apply. Call 804-409-0928 to start.

CALL 804-409-0928
Property Feasibility Intake

Request an ADU & Suite Review

Let our specialists analyze your lot setbacks, existing structures, and local jurisdiction rules across Greater Richmond.

Strict privacy. No spam. Direct phone review with our Richmond team.
CALL